Wednesday, April 29, 2020
Thursday, April 16, 2020
Tuesday, April 7, 2020
Saint Teresa's Parking Lot Mural - STEP 1 Attend to asphalt
Driveway / Asphalt maintenance 101
The parking lot has significant cracks that should be filled before we paint the mural:
Good step by step asphalt maintenance/repair video:
DIY Materials list: -Latex-ite Driveway Sealer https://amzn.to/2MsqVoO -Latex-ite Super Patch https://amzn.to/2KW235R -Latex-ite Crack Filler https://amzn.to/2Nlpvwc -Floor Squeegee https://amzn.to/33QzH5J
Asphalt should be sealed and allowed to dry for 2 days before we paint:
![]() |
Final Design |
![]() |
Areas needing to be primed |
The parking lot has significant cracks that should be filled before we paint the mural:
These small cracks have weeds that will grow and force the crack to enlarge. |
This big crack is over 2 inches wide and runs right through the center of a hopscotch location |
loose wall surface |
loose wall surface |
DIY Materials list: -Latex-ite Driveway Sealer https://amzn.to/2MsqVoO -Latex-ite Super Patch https://amzn.to/2KW235R -Latex-ite Crack Filler https://amzn.to/2Nlpvwc -Floor Squeegee https://amzn.to/33QzH5J
Asphalt should be sealed and allowed to dry for 2 days before we paint:
Subscribe to:
Posts (Atom)